SOCAR is going to build new production platform at offshore deposit

SOCAR is going to build the new production platform # 620A at the offshore deposit Neft Dashlary. Construction is perform by Neftgaztikinti trust. The platform is meant for drilling of 8 wells and will be installed at sea depth of 27 m. They will install at the platform the modern drilling equipment, a helicopter port, special reservoirs for waste water, automated management system, and fire-prevention system, and 3 diesel electric aggregates.

Translated by Nadezhda Poltoratskaya

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer