Gazprom already constructed 220 kilometers of Turkish Stream

The laying of two threads of the Turkish Stream gas pipeline is in full swing and works connected with drilling of two microtunnels and laying pipes on the ground have already been completed.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer