Belorusneft has tried a new technology for secondary layer outstripping and intensification of oil inflow

The well repairers and the field geophysicists have successfully held perforation and depression trials at well #4 of the West-Kalininsky deposit of  Belorusneft.

The perforation on depression is a new technology for secondary layer outstripping and intensification of oil inflow. The main advantages of this method are the decline in the round trip operations, time of geological and technical measures execution and an enlargement in well productivity.

Now West-Kalininsky #4 operates with daily debit of over 50 tons.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer