Polymetal resumes work at the Maysky open-cast mine

During a three-month stoppage at the quarry and the gold recovery plant, the equipment was repaired, a work plan was prepared for this year, and a scheme for inter-cycle flotation was introduced at

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer