Kazakhstan has increased throughput capacity of its site of TON-2 up to 10 mln tons of oil a year
Edited by Rhod Mackenzie / 2016-09-02 05:45:33
The capital repair of a site of a route oil pipeline Tuymazy-Omak-Novorossiysk-2 (TON-2) with the length of 185.6 km with the full replacement of the pipeline is over.
