Oil extraction of Udmurtneft from realization of geological-technical measures and drilling rose by 9% in 2015
The realized by Udmurtneft program of geological-technical measures, construction of new wells and side holes provided the additional extraction of about 860 thousand tons of oil, by 8.9% more than in 2014.
In Udmurtneft held 1,290 geological-technical measures – by 10% more than in 2014. The maximum effect from the geological-technical measures was held at the Ludoshursky, Kiengopsky, Kotovsky, Listvensky deposits.
The driftage volume in operational drilling in 2015 grew by 5.8% to make up over 91 thousand m of rocks. Commercial speed rose to 2,003 m. In total 84 new wells and horizontal sidetracks were drilled.
The successful realization of the program of drilling new wells, geological-technical measures, application of new technologies of extraction, development of new license sites provided a stable level of extraction at more than 6.4 mln tons of oil a year despite of the fact that many deposits in Udmurtia are at the late stage of development.
