Oil extraction of Udmurtneft from realization of geological-technical measures and drilling rose by 9% in 2015

​The realized by Udmurtneft program of geological-technical measures, construction of new wells and side holes provided the additional extraction of about 860 thousand tons of oil, by 8.9% more than in 2014.

In Udmurtneft held 1,290 geological-technical measures – by 10% more than in 2014. The maximum effect from the geological-technical measures was held at the Ludoshursky, Kiengopsky, Kotovsky, Listvensky deposits.

The driftage volume in operational drilling in 2015 grew by 5.8% to make up over 91 thousand m of rocks. Commercial speed rose to 2,003 m. In total 84 new wells and horizontal sidetracks were drilled.

The successful realization of the program of drilling new wells, geological-technical measures, application of new technologies of extraction, development of new license sites provided a stable level of extraction at more than 6.4 mln tons of oil a year despite of the fact that many deposits in Udmurtia are at the late stage of development.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer