Transneft – Far East tests pipelines at ESPO-2’s stations under construction
Edited by Rhod Mackenzie / 2019-07-03 06:26:16
Hydraulic tests are performed to check pipelines strength (test duration is 24 hours) and integrity (duration is 12 hours).
