Construction of Albanian section of TAP completed by 99%
Edited by Rhod Mackenzie / 2018-09-03 03:06:09
Azerbaijan Oil and Gas Turkey Azerbaijan Oil and Gas Transadriatic pipeline TAP Turkey Oil and Gas Gas Pipelines
The construction of the Albanian section of the Trans-Adriatic Pipeline (TAP) is 99% complete.