“Gazprom Neftekhim Salavat” discusses the construction of CCGT plant

The delegation from “Gazprom Transgaz Ufa” LLC, “Gazprom Mezhregiongaz Ufa” LLC and OJSC “Gazprom gas distribution Ufa” visited the project of “Gazprom Salavat neftekhim” - the construction of combined cycle gas turbine (CCGT) of 410 MW capacity. Currently, there carried out operation on assembling of junction point of the gas pipeline branch of the power-generating unit to the main gas pipeline “Kumertau – Ishimbai”.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer