Maximum gas production at Shakh-Deniz-2 might rise almost 1.5 times - Minister

The assessment of the maximum gas production in the framework of the Shakh-Deniz-2 in the Azeri sector of the Caspian is underestimated.

The Minister of Energy of Azerbaijan, N. Aliev, said at the 21st International Workshop and conference “Oil, Gas, oil processing and oil chemicals of the Caspian”.

According to him, the maximum gas production at the Shakh –Deniz-2 is forecast at the level of 20 bln cubic m.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer