RITEK has finalized design documentation for development of the deposits in the Samara and the Volgograd regions
Edited by Rhod Mackenzie / 2014-10-06 01:09:32
Oil and Gas Russia Russia Oil and Gas Drilling Gas Geological prospecting Lukoil Oil Production and Refining
The Central Commission for Finalization of the Technical Projects for Hydrocarbon Deposits Development of the Federal Subsoil Use Agency (CKR Rosnedra) has finalized for RITEK design documentation for development of the Tominskoye and the Southern Zhiltsovskoye deposits in the Samara region. Their extractable deposits are correspondently 340,000 tons and 102,000 tons.