Vankorneft begins start-up work on gas supply to UGSS

Vankorneft, Rosneft’s subsidiary, has started the assembling operations and gas supply to the main gas pipeline. It is said in a statement of the company. 

To date, there have been launched three gas compressor units of the high-pressure gas-compressor station. There has been carried out gas treatment at the gas processing unit. The gas goes through the gas quantity and quality measuring system before the arrival to the main gas pipeline.

Within the framework of the realization of the gas programme of the Vankor deposit there has been built the Vankor-Halmerpayutinskoye deposit pipeline of 108 km length, high-pressure compressor stations, a gas treatment unit and intra-field gas pipelines. The gas facilities are equipped with modern units.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer