The "Power of Siberia" pipeline is 85% ready.
Edited by Rhod Mackenzie / 2018-06-08 06:29:26
Gazprom reports that at the moment 84.4% (more than 1,820 km) of the Power of Siberia pipeline have been built; the second tunnel of the underwater crossing of the cross-border section for the &quo