Transneft bleeds oil at section of Yaroslavl-Kirishi-2 to prepare for pumping of oil products
Edited by Rhod Mackenzie / 2015-06-09 12:17:17
Transneft has completed the displacement of oil at the section of the main oil pipeline Yaroslavl-Kirishi - 2 to prepare for the transfer of the system to oil pumping, the company reports.
"Oil displaced at the section of 521 km length, which is a part of measures to transfer the pipeline to transportation of diesel fuel. The works were carried out in the framework of the project "Development of the system of main pipelines to increase the supply of oil products to the port of Primorsk" /project "North"/, - Transneft reports.
