Gazprom starts an installation of gas pumping equipment at a compressor station “Russkaya” of the gas pipeline “South Stream”

Gazprom started an installation of a gas pumping aggregate at a compressor station “Russkaya” in the Krasnodar region on December 6. The station is going to provide gas transportation via the “South Stream”, is said in a statement of the company.

The gas pumping aggregate “Ladoga” (32 MW capacity) with high efficiency (36%) and low level of emissions of Russian manufacture is being installed at the compressor station. 

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer