“Gazpromneft” carried out 15-staged hydraulic fracturing

“Gazpromneft-Khantos” put into operation a horizontal well. There was carried out a large-volume 15-staged hydrofracturing on it for the first time by the “Gazpromneft” Group of companies. It became possible due to an appliance of non-spherical technology of drilling in and well stimulation.

Multi-stage hydrofracturing in the borehole of the Yuzhno-Priobskoye deposit has been carried out within the framework of operations with difficult-to-recover oil resources, the press-service of the company states. The length of the horizontal section made up 760 meters, the depth of the well – 4.2 km. Peculiarity of positioning of the horizontal section is that it allows operation on inflow stimulation throughout the period of well production and lift restrictions in the number of hydrofracturings.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer