Transneft - Ural completes the reconstruction of the underwater crossing of the Ishim and Kuvash rivers.
Edited by Rhod Mackenzie / 2016-01-11 08:00:02
Transneft - Ural completed work on the reconstruction of the floodplain in the underwater sections of the main oil product pipeline Ufa - Petropavlovsk across the Kuvash River in the Chelyabinsk region and Ishim in Kazakhstan.
During the reconstruction of the underwater crossing through the Kuvash river near linear production-dispatching station (LPS) Berdyaush sections of the pipeline with total length of 511.72 meters were replaced, a new assembly of valves, sewage pit, block-box monitoring and control points (PKU) were installed.
