Transneft - Ural completes the reconstruction of the underwater crossing of the Ishim and Kuvash rivers.

Transneft - Ural completed work on the reconstruction of the floodplain in the underwater sections of the main oil product pipeline Ufa - Petropavlovsk across the Kuvash River in the Chelyabinsk region and Ishim in Kazakhstan.

During the reconstruction of the underwater crossing through the Kuvash river near linear production-dispatching station (LPS) Berdyaush sections of the pipeline with total length of 511.72 meters were replaced, a new assembly of valves, sewage pit, block-box monitoring and control points (PKU) were installed.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer