Half of pipes necessary for Power of Siberia have been delivered to Yakutia

​Over 200 thousand tons of pipes have been delivered to Yakutia for the construction of Power of Siberia. This is a half of the necessary volume.

Currently 216 thousand tons of pipes have been shipped, this is 49% of the total volume (plan – 439 thousand tons). This winter over 185 thousand pipes will be welded in the Olekminsky district.

The total volume of cargo which will be delivered in the navigation period for the construction of Power of Siberia is 800 thousand tons. The navigation will be over in late September-October.

The cargo shipment is held according to the schedule. The first shipment started in May.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer