Technological tests of Neptune drilling rig take place in Astrakhan

The jack-up drilling rig Neptune was tested in the grounds of the Astrakhan shipbuilding production association.

During the tests the body of the drilling rig (about 10 thousand tons) was lifted to 195 metres – for the first time in the Astrakhan Region.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer