Permenergo granted 1.2 MW to the objects of Arayzhsky oil deposit in Kueda district
Edited by Rhod Mackenzie / 2014-11-11 01:05:26
In the framework of the execution of the obligations on the technical connection the specialists of Permenergo have connected a number of oil objects of the Aryazhsky deposit in the Kueda district to the electric network.
In conformity with the submitted to Permenergo application the capacity made up 1.2 MW.