JSC “Transneft-Diascan” inspected 16 thousand km of oil pipelines and oil product pipelines in Jan-April 2016
Edited by Rhod Mackenzie / 2016-05-12 06:14:39
JSC “Transneft – Diascan” inspected nearly 14 thousand km of trunk pipelines of OJSC “Transneft” in January-April 2016. The operation was carried out using pipe inspection devices of own production. These figures are fully compliant with the diagnostic examination plan of “Transneft” in 2016. Most part of the work was carried out at “Transneft – Vostok” pipeline (2.5 thousand km), JSC “Transneft - Western Siberia” (1.6 thousand km) and JSC “Chernomortransneft” (1.6 thousand km).