Sverdlovsk plant has shipped the 3rd drilling unit to Surgutneftegas

In total until April 2016 Surgutneftegas will receive 7 units from the Bulanashsky car manufacturing plant.

The Bulanashsky car manufacturing plant has shipped the 3rd drilling unit to the oil deposit of Surgutneftegas, the Ministry of Industry and Science of the Sverdlovsk region reported.

The 3rd drilling unit was shipped to the South-Nyurymsky deposit where it is planned to ship another two units within a year.

The plant doesn’t release the amount of the contract. The first unit was shipped in April 2015, the second one – in August.

The enterprises of the Sverdlovsk region produce almost the entire range of goods for the needs of the oil and gas sector. Car manufacturers actively develop the import replacement direction for the fuel and energy sector. In 2015 the operational testing of the import substitution TDS for drilling units was successfully held. The equipment was designed by Uralmash NGO Holding, was tested at the Ombinsky deposit in the Khanty Mansi Autonomous Area where 3 wells with the total depth of 11 km were drilled with its help.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer