Aganneftegazgeologiya realizes development bore holes construction programme
Edited by Rhod Mackenzie / 2015-04-14 07:47:49
OJSC “International transshipment complex “Aganneftegazgeologiya” (subsidiary of an oil company “Russneft”) implements new exploitation bore holes construction programme. The main volume of drilling operation is carried out at the Roslavl licensed site.
There finished the construction of a horizontal well No127 at a cluster pad No17. The total well depth makes up 3 922 meters, the length of the horizontal area makes up 500 meters. There entered formation YV1-1 during the drilling. Directional drilling of slant holes No3023 finished at the cluster pad No11, the target depth – 4 030 meters.
