Transneft completes engineering works at line part of Kuyamba-Taishet

Transneft has completed surveying, including geodesic, geologic and geophysical survey at line part of the Kuyamba-Taishet main oil pipeline for construction of a pipeline.

According to the report of ESPO’s project management office, surveying at crossings of the main oil pipeline with water barriers for construction of reserve strings on the rivers Angara Chuna (Uda) and Biryusa, reports Nefttrans.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer