JSC “Transneft-Siberia” keeps operation at the main oil pumping station of Zapolyarye-Purpe oil pipeline

JSC “Transneft-Siberia” continues general construction and installation work at main production facilities of the main oil pumping station No.1 of Zapolyarye-Purpe, they stated in the company’s press-service.

There carried out water bypass from the reservoir RVSP-20000 No.7 to RPSP-20000 No.6 for the check of the internal floating roof during the hydraulic testing of the tank battery at the main oil pumping station No.1

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer