Transneft-Vostok keeps constructing oil reservoirs at oil pumping station-21 at Skovorodino-Mokhe oil pipeline

​Transneft-Vostok, an affiliate of Transneft, keeps increasing the capacities of the Skovorodino-Mokhe oil pipeline up to 30 mln tons of oil a year.

The construction of reservoirs in the framework of the 3rd stage of the project’s realization is held at the oil pumping station -21 Skovorodino.

The works on the construction of an oil reservoir with the capacity of 50 cubic m at the oil pumping station-21 at Skovorodino started in August 2015.

Simultaneously a reservoir for the storage of emergency water with the volume of 2 thousand cubic m is being constructed.

The works on the construction of the basement of the oil reservoir, assembly of metal constructions of the bottom of the reservoir are held. The construction of the basement of the reservoir for the storage of emergency water is over.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer