Transneft Siberia reconstructs three sections of the Surgut-Gorkiy-Polotsk pipeline.
Edited by Rhod Mackenzie / 2019-04-17 08:47:33
The total length of 1.6 kilometers.
The total length of 1.6 kilometers.
Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer