10-stage formation hydraulic fracturing carried out at the Vyngapurovskoye field for the first time in Russia

 horizontal well, where a 10-stage formation of hydraulic fracturing was carried out for the first time in Russia, has been launched at the Vyngapurovskoye field of Gazpromneft (the field is developed by Gazpromneft-Noyabrskneftegaz). The maximum quantity of the formation hydraulic fracturings in one hole of the Gazpromenft’s horizontal wells was 8 stages – the company made it for the first time in June of 2013 also at the deposit.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer