Transneft to construct 6 vertical reservoirs on the territory of Samara District Oil Pipeline Management costing 1 bln roubles

Transneft –Privolga announced a tender for the construction of 6 vertical reservoirs on the territory of the Samara District Oil Pipeline Management in the Volga district of the Samara region. 1 bln 161 mln roubles are directed for the execution of works.

It is planned to construct 6 reservoirs with the capacity of 20 thousand cubic m each. The construction is to be completed by the beginning of October 2016. The Samara District Oil Pipeline Management is the most important transport hub of Transneft-Privolga JSC. The length of the operated oil pipelines of the Samara District Oil Pipeline Management is over 1,000 km.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer