Gazpromneft launches the second production well at Prirazlomnoye field

Gazpromneft has launched the operation of the second production well, whose flow rate will be 1.8 thousand tons per day, at the Prirazlomnoye field, the company reports.

Due to its planned launch, in 2015, the oil production will increase more than two times as compared with 2014, when 300 thousand tons of oil were produced at the Prirazlomnoye field. The depth of the new well is more than 4.5 thousand meters, the drilling was carried out by Russian company Gazprom drilling, the release informs.

In total, the project provides for launch of 36 wells, including 19 production, 16 injection and one absorbent. The first production well at the field was launched on December 19th, 2013.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer