In the beginning of 2014, Rosneft exceeded gas production plan by 13%
Edited by Rhod Mackenzie / 2014-01-21 11:26:14
In the beginning of 2014, Rosneft exceeded gas production plan by 13% to 2.3 billion cubic m. Oil production was 7.4 million tons, by 16,300 tons more than the planned. Since the beginning of the year, Rosneft has launched 38 new wells, built 16 side holes, and executed layer hydraulic fracturing at 31 wells.
Translated by Nadezhda Poltoratskaya
