Gas pipeline from continental part of Russia to the Crimea will go from Taman to Sevastopol
Edited by Rhod Mackenzie / 2015-07-21 11:24:10
The gas pipeline of the Crimea which will connect the continental part of Russia with the Crimea will go by the “Taman-Simferopol-Sevastopol” route, Chernomorneftegas said on July 20th 2015.
The route pipeline is the underground and underwater pipeline.
The gas pipeline has “1a” level of importance.
This is quite a high level.
Among peculiar conditions of construction of the gas pipeline, the protection from seismic influence of 7-9 points is emphasized. The period of the gas pipeline’s operation should be at least 50 years.
The maximum working pressure is 75 kgf/sq cm.
