Gas pipeline from continental part of Russia to the Crimea will go from Taman to Sevastopol

​The gas pipeline of the Crimea which will connect the continental part of Russia with the Crimea will go by the “Taman-Simferopol-Sevastopol” route, Chernomorneftegas said on July 20th 2015.

The route pipeline is the underground and underwater pipeline.

The gas pipeline has “1a” level of importance.

This is quite a high level.

Among peculiar conditions of construction of the gas pipeline, the protection from seismic influence of 7-9 points is emphasized. The period of the gas pipeline’s operation should be at least 50 years.

The maximum working pressure is 75 kgf/sq cm.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer