Gas pipeline to the Crimea is constructed ahead the schedule
Edited by Rhod Mackenzie / 2016-07-22 04:49:26
The Minister of Fuel and Energy of the Crimea, S. Borodulia, said that the construction of the Kuban-Crimea gas pipeline is held ahead the schedule.
