Construction of Power of Siberia increases shipment at Lena rail junction by a third
Edited by Rhod Mackenzie / 2015-07-23 07:40:48
The construction of Power of Siberia has increased shipment at Lena railway junction by a third. This was reported by head of Severobaykalsk center on organization of the station work Oleg Kazakov.
On the results of the navigation in April-June this year, the shipment increased by 32% as compared to the same period of 2014 and reached 18.4 thousand tons. "The unloading of tubular products for Power of Siberia significantly increased the load on the station. Now there is a mass flow of equipment and materials for this ambitious project," - said Kazakov.
