The first pyrolysis column weighing 1.5 thousand tons was installed at the Amur Mining and Chemical Combine
Edited by Rhod Mackenzie / 2021-08-23 10:07:42
Key technological equipment is being installed at the Amur Gas Chemical Complex.
