Oil transportation resumed via ESPO-2 and the branch pipeline to the Komsomolsk Refinery
Edited by Rhod Mackenzie / 2020-09-23 05:38:28
All 60 trunk pumps responsible for oil transportation through ESPO-2 and the branch pipeline were tested for compliance with 50 parameters, including temperature and vibration level.
