Gazprom Neft has put into operation the 6th extraction well at Badra deposit in Iraq
Edited by Rhod Mackenzie / 2015-09-24 01:59:14
Gazprom Neft has put into operation the 6th extraction well (P-13) at the Badra deposit in Iraq. Its output is 10 thousand barrels of oil a day. From the beginning of operation of the new well, the extraction volume at the deposit rose from 35 thousand to 45 thousand barrels a day. In early 2015 this rate made up 17 thousand barrels. Like the other wells of the deposit, P-13 will be operated by the fountain method. Currently in the framework of the signed contract with ZPEC (China), the drilling of P-09, P-15 and P-12 wells goes on. They are planned to be put into operation in 2016.