Achimgaz launches 4th technological workshop for the production of HTR Achimov gas

There launched the 4th technological workshop at a gas processing plant (UKPG) No31 in Novy Urengoi. It produces hydrocarbons from the Achimovsky formation of the Urengoi oil-and-gas condensate deposit. The total capacity of UKPG will increase by more than 30% with the launch of a new workshop. The press-service of “Gazprom dobycha Urengoi” reports.

The workshop No4 is identical to the three current technological lines and meant for cleaning of gas-condensate mixture and separation of gas from liquid state of gas condensate (gas condensate and fossil water).

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer