Transneft has told about plans for pumping through Druzhba oil pipeline in 2022

In 2022, the pumping of oil through the Druzhba main oil pipeline to Germany is planned at the level of 19.3 million tons, to Poland - 13 million tons.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer