New reservoirs launched at Transnefteprodukt OJSC

New reservoirs are being prepared for the launch at the enterprises of Transnefteprodukt OJSC. The construction of reservoirs at the branches of “South-West transnefteprodukt” OJSC was held in the framework of the long-term program of technical retooling, reconstruction and capital repair of infrastructure objects.

In July 2014 at the line operation control station “Nikolskoe” at the reservoir park #1 the construction of the vertical steel reservoir #4 with the volume of 5,000 cubic m was completed. This is the first reservoir constructed by the plate-by-plate method.

After the hydrotests the reservoir was connected to the existing technological scheme. Currently the works on the development of the territory are carried out.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer