Gazprom Neft has drilled the longest horizontal well at Yamal

Gazprom Neft has drilled for the first time a horizontal well at Yamal with length of the horizontal hole of over 1,500 m and total length of 4,200 m. The horizontal division is located by 91% in the oil saturated layer of the Novy Port suite characterized with high transparency of the rock enabling to raise high debits without layer hydraulic fracturing.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer