Gazprom, Edison and DEPA to conduct evaluation of gas supply on the bottom of the Black Sea before the end of this year
Edited by Rhod Mackenzie / 2016-02-29 12:44:52
Gazprom, Edison and DEPA will conduct a feasibility assessment of gas supplies via the Black Sea before the end of 2016, said head of Gazprom Alexei Miller at the meeting with the Russian President Vladimir Putin. "In Rome, a memorandum on the assessment of the feasibility of building a gas pipeline from Russia under the Black sea through a third country in the direction of Greece and then to Italy was signed, - he said. - The memorandum provides for technical and economic assessment before the end of 2016".
