SOCAR to construct compressor station for APG loading into general gas transport infrastructure from Balakhani-Sabunchu-Ramana block

SOCAR plans in October 2015 to complete the construction of a new compressor station for the loading of APG  into the country’s gas transport system collected by Balakhani Oil from the block of onland deposits at Balakhani-Sabunchu-Ramana.

The new compressor station is constructed to replace the old existing station. It consists of 2 compressors with the capacity of 50 thousand cubic m of gas a day each. The station is equipped with  a modern system of electricity supply and controlling-measuring devices.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer