Shebelinsky gas processing plant reduced processing by 1.1% over 9 months

​In Jan-September 2015 the Shebelinsky gas processing plant reduced gas condensate processing of Ukrainian origin by 1.1% (by 3.9 thousand tons) against Jan-September 2014 – to 353.5 thousand tons, the Ministry of Energy and Coal reported.

In September the Shebelinsky gas processing plant increase raw materials processing by 29.8% (by 7.2 thousand tons) to 31.4 thousand tons against September 2014.

In Jan-September 2015 the Shebelinsky gas processing plant reduced petrol output by 11% (by 16.9 thousand tons) to 137.4 thousand tons, diesel fuel – by 8.4% (by 7.4 thousand tons) to 80.6 thousand tons, grease oil – by 0.3% (by 0.1 thousand tons) to 39.2 thousand tons.

The Shebelinsky gas processing plant with the capacity of 1.05 tons/year is the main production asset of Ukrgasdobycha, 100% shares of which belong to Naftogas.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer