Tuapse oil refinery plant of Rosneft has been produced the 2nd reforming column for output of high-octane petrol

​On July 22nd 2015 the 2nd reforming column for the production of high-octane petrol of European standard was delivered to the production site of the Tuapse oil refinery plant in the framework of the large-scale investment program on modernization, Rosneft reported.

The reforming column was produced at Volgogradneftemash. It became the largest one out of the delivered in 2015 equipment.

The length of the column is 67 m, diameter – 8 m, weight -470 tons.

The column is produced out of the materials which will allow to prolong the period of its operation at the maximum volume.

The equipment was delivered from Volgograd by river barge to Azov, then by the Black Sea to the high-capacity pier of the Tuapse oil refinery.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer